• long8-龙8-龙八(国际)娱乐官方网站

    HOME SOLUTIONS

    Indonesia Java 7 2×1050MW Coal-Fired Power Plant Project

    The 2×1050MW Coal-fired Power Generation Project of Java 7 in Indonesia is a flagship energy project under China's Belt and Road Initiative. It is China's first IPP Coal-fired power project with a capacity of one million kilowatts exported overseas, and also the first ultra-supercritical coal-fired power generation project with a capacity of one million kilowatts in Indonesia. SIFANG provided Electrical Control System (ECS), Network Control System (NCS), protection relays of generator-transformer unit, and protection relays of 500kV step-up substation for this project. The project implementation team has been highly appraised by the general contractor and recognized by the owner.

    777.jpg

    Related Projects

    友情链接: