long8-龙8-龙八(国际)娱乐官方网站

HOME SOLUTIONS

UHV Operation & Maintenance Integrated Comprehensive Simulation Training Project

This project simulates the entire 500kV ultra-high voltage grid in Shanxi Province, China and conducts detailed simulation of a 500kV substation. It offers training functions such as 3D visualization of primary and secondary substation equipment, on-site inspection, equipment operation, fault handling, and standardized ticketing procedures.


8884.png

999.png

Related Projects

友情链接: